Category: Activities
Published: Sunday, 10 June 2007
V nedeljo dopoldne smo se v jamo podali Ivo, Dušan Tominc (iz Podkraja) in Matjaž z namenom, da izvrtamo sidrišča za zaščitno betonsko ploščo. Pred jamo smo postavili agregat in do skalnega podora napeljali dobrih 40m kabla.
Dušan was boldly testing the stability of rockfall with a sledge hammer while Ivo was laying down the cable.
The cable was laid and I went to start teh generator. When I came back Dušan was all in to drilling.
Anchors that we'll place in holes are actually reinforcement steel Fi-16.
Many holes needed to be drilled.
The rockfall was temporally secured with steel pipes and wood.
When I was leaving there were still many holes left to be drilled.